ORGANIZED BEFORE INSTALLATION BEGINS
A clear path from
plan to finished room.
Our process is designed to reduce delays, improve communication, protect the home, and keep the project moving.
Complimentary consultation
We discuss your bathroom, design preferences, comfort needs, desired features, and goals.
Design and material selection
Select your tile, shower flooring, fixtures, vanity, lighting, hardware, glass, paint, and accessories.
Final planning
We confirm measurements, selections, project scope, materials, and installation timing.
Home protection and demolition
We protect floors, hallways, and nearby areas before removing the contracted bathing area down to the framing.
Repair, plumbing, and waterproofing
We inspect the exposed area, address ordinary water damage within our work area, prepare the walls and floor, update accessible shower plumbing, and install the wet-area backing and waterproofing system.
Tile and finishing
We install the shower flooring, large-format porcelain tile, selected fixtures, glass, seating, grab bars, hardware, and finishing details.
Final walkthrough
We review the completed bathroom with the homeowner, address final details, and provide care and warranty information.
OUR TIMING COMMITMENT
Completed within four business days—and often less.
Qualifying bathroom renovations are completed within four business days—and often less—after installation begins.
BUILT FROM the STUDS OUT
A beautiful bathroom
is only as reliable as what is behind it.
Our standard process includes protection of floors and hallways, removal of the existing bathing area, inspection of exposed framing, subfloor, and plumbing, ordinary water-damage repairs within our work area, wall and floor preparation, professional wet-area backing and waterproofing, updated accessible shower plumbing, new pressure-balancing shower valve, large-format porcelain wall tile, slip-resistant shower flooring, and installation of the customer's selected fixtures and finishes.
We do not knowingly cover damaged materials with a new bathroom. We take responsibility for every part of the work defined in our written project scope—from demolition and ordinary framing repairs through plumbing connections, waterproofing, tile installation, and final trim.